Consultancy Services for Preparation of Preliminary Design, Tender Documents, Safeguards (ESIA and RAP) Reports and Construction Supervision of Water Treatment Plants and NRW Pilot Project for "Extension of Water Resources for Faisalabad City – Phase II"

Appel à Manifestation d'Intérêt

Informations générales

Pays:   Pakistan
Ville/Localité:   FAISALABAD
Numéro de l'avis/du contrat:   01
Date de publication:   Fev 12, 2019
Date limite (heure locale):   Mars 5, 2019 - 12:30
Agence de financement:   Agence Française de Développement - Agence de Financement
Acheteur:   PAKISTAN - Water and Sanitation Agency Faisalabad
Eligibilité des Soumissionaires:   Minimum qualification criteria will be as per AFD's Procurement guidelines and Punjab Procurement Regulatory Authority Rules(PPRA,Punjab,Pakistan).
Langue d'origine:   Anglais

Contact

Adresse :   ASAD ALI
MR.
Water and Sanitation Agency Faisalabad
WASA HEAD OFFICE OPPOSITE ALLIED HOSPITAL, 38000
38000
FAISALABAD, PUNJAB 38000
Pakistan
Téléphone:   + 92 336 8880226
Fax:   + 92 41 9210054
Adresse électronique :   Cliquez ici
Site Web:   http://wasafaisalabad.gop.pk

Missions

 

Dossier d'appel d'offres et documents joints

 
  • Sollicitation: Detailed Expression of Interest (EOI) for Consultancy Services (3 MB; Jan 8, 2019)
  • Amendement: Corrigendum (6 MB; Fev 12, 2019)
     Télécharger le(s) document(s)

Texte original

Water and Sanitation Agency of Faisalabad

Country: Pakistan

Project: Extension of water resources for Faisalabad city – Phase II

Credit No. CPK 1038

Assignment Title: Consultancy Services for Preparation of Preliminary Design, Tender Documents, Safeguards (ESIA and RAP) Reports and Construction Supervision of Water Treatment Plants and NRW Pilot Project


1. The project involves the implementation of the components described below:

Component 1: Increasing of the water production capacity
As part of the project, it is planned to increase drinking water production capacity by 135 000 m3/d through:

- the extension of the existing surface Jhal Water Treatment Plant capacity by 22 500 m3/d

- the construction of a new 112 500 m3/d water treatment plant near Jaranwala Road at Lower Gogera Canal Branch and the distribution/arterial network

These water treatment plants will be implemented on EPC Mode with 3 years O&M period (O&M cost would be financed separately by Govt. of Punjab through its own sources).

Component 2: Non-Revenue Water

The project includes a Non-Revenue Water (NRW) reduction program and the establishment of Zones (District Metering Zones/DMZ and District Metering Areas) through installation of bulk meters, customer meters, SCADA system, leak detection and piloting the concept of 24/7 service.

2. The consulting services of this assignment (“the Services”) include:
• undertaking of topographic and geotechnical surveys,
• Review and finalization of preliminary design and preparation of tender documents,
• assistance to F-WASA in tendering process,
• works supervision services,
• assisting F-WASA in construction completion and commissioning
• Preparation of Safeguards Reports: Environmental and Social Impact Assessment (ESIA) and Resettlement Action Plans (RAP) as per World Bank guidelines.
Veuillez noter que cet avis est pour information seulement.
Nous nous efforçons de fournir des informations les plus exactes et mises à jour mais nous ne pouvons pas garantir que toutes les informations fournies sur notre site ne contiennent pas d'erreur.
Si vous avez des suggestions/corrections pour cet avis, n'hésitez pas à nous en informer.