The Antalya Metropolitan Municipality, General Directorate of Antalya Water and Wastewater Administration -ASAT (hereinafter “the Employer”) has received funds from Agence Française de Développement ("AFD") toward the cost of “Waste Management and Sewage Project-CTR1084”, and it intends to apply part of the funds to payments under the contract for “Contract No. ASAT/C1 -Waste Sludge Incineration And Energy Recovery Facility Project”.
The Waste to Energy Plant will be procured under the AFD template “Bidding Documents for Procurement of Works (Design, Build and Operate)”, dated October 2019 and available online at
https://www.afd.fr/en/responding-bid-invitation (in the section “download the model documents / Works contracts / Bidding documents for procurement of works”). The General Conditions of Contract (GCC) are the FIDIC's Conditions of Contract for Design, Build and Operate Project (FIDIC Gold), first edition 2008. However, these standard procurement document (SPD) aim to address short Operation Service Periods.
The Employer intends to initially select a maximum of 7 firms for this Design, Build and Operate (DBO) Contract.
The location of the DBO Contract (Contract No. ASAT/C1; Waste Sludge Incineration and Energy Recovery Facility Project) is within the boundary of Hurma Wastewater Treatment Plant (WWTP) - Konyaaltı District in Antalya, Turkey.
The Employer intends to construct the sludge incineration facility with the capacity of 500 ton/day to disposal domestic waste sludges that are being produced from central and districts WWTPs. Inlet dry matter content will be average %18.
It is aimed that the facility to be built will have optimal energy efficiency and heat balance, and it is requested to be designed and constructed in accordance with environmental and occupational safety standards, permits and regulations.
The main objectives of the Project are besides sludge disposal:
(i) energy recovery.
(ii) usage of produced energy in the necessary sections of the facility and treatment plant
(ii) reduction of carbon footprint and ensuring sustainable environmental quality.
Detailed requirements are specified in PART-2 Employer’s Requirement Section.
Contract duration will cover 24 months construction period and 24 months operation period. Construction period will cover design and construction phases; operation period will cover the operation and training phases.
Detailed Qualification Criteria for the initial selection procedure are specified in Section III., Initial Selection Criteria, Table 1. Qualification Criteria.
It is expected that invitations for bid will be made in May, 2024.
Interested eligible Applicants may obtain further information from ALDAŞ Infrastructure Management and Consultancy Services Industry and Trade Inc. (address below) during office hours from 09:00 am to 18:00 pm (local time) in business days. A complete set of the Initial Selection Documents in English will be published on AFD’s official website
https://afd.dgmarket.com/, www. asat.gov.tr; aldas.com.tr; ekap.kik.gov.tr.
Applications for Initial Selection should be submitted in clearly marked envelopes and delivered to the address below by 14:00 (local time) on 30/01/2024. Late application may be rejected.
ALDAŞ Infrastructure Management and Consultancy Services Industry and Trade Inc.
Project Manager Aras GEZER GÖRGEÇ
Address: Gülveren Mah. 3760 Sokak No:15/1 07220 Kepez /Antalya /Türkiye
Tel: 90 (242) 259 32 16 (pbx)
Fax: 90 (242) 259 32 20
E-mail: yonetim@aldas.com.tr